Portable Power Station LiFePO4 600 Wh, Pure Sine, 50-Minute Charging

Power & pumps

Portable Power Station LiFePO4 600 Wh, Pure Sine, 50-Minute Charging

from €494.50 per piece, net, at the factory MOQ

Portable power station for camping, RVs, field work and emergency power. According to the supplier: LiFePO4 battery (600 Wh in the variant, 512 Wh in one photo), 600 W pure sine inverter (up to 1500 W in the specs), MPPT controller, 50-minute charging from 220–240 V mains and solar charging. Outputs: USB-A fast charge up to 18 W, two 15 W USB-A, Type-C up to 100 W, DC 12 V / 3 A, RV port, wireless charging, flashlight. 3000 cycles, IP20, 280 × 190 × 196 mm, 6.3 kg.

  • MOQ 2 pcsminimum order (factory MOQ)
  • Branding on requestlogo, colours, packaging
  • GPSR label & EU docswe act as EU importer
  • 8–12 weeks to your doorrail/sea; air on request

Indicative “from” price per piece, excl. VAT, freight and duty. Your delivered price depends on quantity, branding and destination — written offer within 2 working days.

Specifications

BatteryLiFePO4, 600 Wh per variant (512 Wh in photo), 3000 cycles
Rated power600 W (up to 1500 W in specs) (per supplier)
OutputsAC (pure sine), USB-A 18 W + 2 × 15 W, Type-C 100 W, DC 12 V, RV
Charging220–240 V mains in 50 min, solar (MPPT)
Dimensions280 × 190 × 196 mm, 6.3 kg
PlugEU plug type agreed on order
Shippinglithium battery — shipped under carrier rules
Package / weight29 × 20 × 21 cm / 12 kg

Data from the manufacturer. Sizes, colours and materials can be adjusted for orders above the MOQ.

How to order this product

Ask for a price

Tell us the quantity, colours and destination country. Offer within 2 working days.

Get a sample

We send a sample to your address in 7–14 days. The cost is credited against the order.

Production and QC

The factory produces in 25–45 days; we inspect the goods before they leave China.

Delivery

Rail or sea to Poland in 25–45 days, customs cleared, then to your warehouse.

Frequently asked questions

What is the minimum order for the Portable Power Station LiFePO4 600 Wh, Pure Sine, 50-Minute Charging?

The factory minimum is 2 pcs. For orders with your own logo or packaging the minimum is usually higher — we confirm it in the offer.

Can I get it with my own logo?

Most products can carry a logo on the product, the label or the packaging. We check the options with the factory and show you a mock-up before production.

Is it compliant for sale in the EU?

We import as an EU company, prepare GPSR labelling with the responsible person and product safety information, and order tests where the material requires it.

How long does delivery take?

Usually 8–12 weeks from order to your warehouse by rail or sea: 25–45 days production plus 25–45 days transport. Air freight takes 7–12 days after production.

Request a price for this product

Quantity, colours and delivery country are enough for a first offer. Add your logo if you want it branded.

  • Reply on working days, usually within a few hours
  • Prices delivered to your door, customs and VAT included in the calculation
  • Written offer within 2 working days

Prefer email? corp@mascotiq.eu · WhatsApp